MEP Consultancy

We are pleased to introduce ourselves as MEP Consultancy providers for all the requirements for Offices, Shopping Malls, Commercial Centres, Residential Buildings, Township Projects, and School Buildings & Hospitals etc.

MEP Design is a nervous system of any establishment or a house, the necessary importance herein lies in the designs and quality of materials and workmanship.

SYNERGY SOLUTIONS offers a unified approach to fulfil the multitude of specific requirements of each project with proven ability to meet the requirements within pre-established financial & time limits. The clients are provided with comprehensive range of engineering services.

At SYNERGY SOLUTIONS the design of services system is a process beginning with ideas translated into plans, which are then carefully coordinated through each phase of activity to produce the desired environment & facility.

Services Provided

Pre Design Stage

  1. Estimation of Pump electrical load, Water balance calculation etc. based on internal layout & other design inputs.
  2. Preparation of Design Basis Reports suggesting Feasible Schemes, Estimated Cost and Relative Merits.
  3. Finalization of Equipment Location & Utility Requirements for the agreed scheme.

Design Stage

  1. Estimation of Pump electrical load, Water balance calculation etc. based on internal layout & other design inputs.
  2. Preparation of Design Basis Reports suggesting Feasible Schemes, Estimated Cost and Relative Merits.
  3. Finalization of Equipment Location & Utility Requirements for the agreed scheme.

Tendering Stage

  1. Preparing Tender Drawings
  2. Preparation of Tender Documents including Detailed Bill of Quantities, Specifications etc. & Invitation of quotations.
  3. Negotiation based on Commercial and Technical Parameters.

Execution Stage

  1. Preparing GFC (Good for the Construction) drawings.
  2. Approval on contractor’s working drawings & designs.
  3. Overall co-ordination with other agency’s works.
  4. Carrying out the Quality inspection on the site, and preparing the reports.
  5. Testing the system as a whole to verify achievement of various parameters like inside conditions, Power consumption, Capacity etc.
  6. Checking the Work, Certification of Bills of the Contracting Agencies.

Post Execution Stage

  1. Authentication of As- Built Drawings
  2. Verification of Handing Over Documentation

  • 300x200
  • 300x200
  • 300x200

ONGOING PROJECTS

Sr No PROJECTS LOCATION
1

Decent Homes, Miraroad Miraroad
2

T3 Goldstar, township Boisar
3

Bungalow Karjat
4

Resi. Building Mahakaye Pali
5

Goldstar residential Khar
6

Kingston, Wing-A to D Swaraj
7

Turkish Airlines office Airport